Case study · 21 Nov 2025

Over 280 manholes,
one goal.

In Erftstadt-Gymnich, Germany, Katec Kanaltechnik is rehabilitating 288 sewer manholes for the municipal utility – with sewer bricks and ERGELIT-KS1.

New channel made of sewer bricks in a manhole in Erftstadt (photo: Katec)
1970s manhole with damage before rehabilitation (photo: Katec)

Initial situation

Manholes from
the 1970s.

The network of the municipal utility Stadtwerke Erftstadt comprises around 280 kilometres of sewers, mainly concrete combined sewers between DN 300 and DN 2000. Parts have been in service for more than 50 years.

The manholes are 2.5 to 6 metres deep. Typical for their age: damaged brick joints, leaking bases, outdated pipe connections, mortar without sulphate resistance, corroded step irons and hydrogen sulphide corrosion.

The project in figures

Key figures
of the project.

From local repairs to full upgrading.

288 manholes

In the district of Gymnich.

280 km

Stadtwerke Erftstadt sewer network.

2.5 to 6 m

Manhole depth at 1 m diameter.

Case by case

A dedicated rehabilitation concept for each manhole.

Rehabilitated manhole in Erftstadt (photo: Katec)

Repair

From sewer brick
to mortar layer.

New channels made of sewer bricks on a base of ERGELIT-KS1, topped with a low-porosity mortar layer to protect against chemical attack.

Project data

Technology & parties.

Client: Stadtwerke Erftstadt. Design: Ingenieurbüro Köster + Volkenborn. Contractor: Katec Kanaltechnik Müller & Wahl GmbH.

Scope: 288 manholes in the district of Gymnich
Structures: 1970s, in-situ concrete or brick bases, concrete rings
Concept: from individual pipe connections to complete manholes
Channels: sewer bricks to DIN 4051, water absorption below 6%
Mortar: ERGELIT-KS1 – low shrinkage, high pull-off strength, chloride-free
Preparation: high-pressure water jetting, milling where required
Coating: in layers by hand or by spraying, compacted
Step irons: corroded old parts replaced with stainless steel rungs

Process

Precise work
in tight spaces.

Especially at transitions between the old and new structure.

Clean manhole walls with high-pressure water, mill off old coatings where required
Build a sound base of ERGELIT-KS1
Lay new channels in sewer bricks
Coat the walls in layers with ERGELIT-KS1 and compact

Conclusion

Reliable
in the long term.

Precise manual work and high-quality materials secure the manhole infrastructure in Erftstadt for the long term. Completion was scheduled for December 2025.

Gallery

Before and
after.

Initial condition, new channel and finished coated manhole. Photos: Katec. Click an image to enlarge it.

Enquiry

Many manholes,
one partner?

We advise you on mortars, processes and materials for your manhole rehabilitation.