Case study · 21 Nov 2025
Over 280 manholes,
one goal.
In Erftstadt-Gymnich, Germany, Katec Kanaltechnik is rehabilitating 288 sewer manholes for the municipal utility – with sewer bricks and ERGELIT-KS1.
Initial situation
Manholes from
the 1970s.
The network of the municipal utility Stadtwerke Erftstadt comprises around 280 kilometres of sewers, mainly concrete combined sewers between DN 300 and DN 2000. Parts have been in service for more than 50 years.
The manholes are 2.5 to 6 metres deep. Typical for their age: damaged brick joints, leaking bases, outdated pipe connections, mortar without sulphate resistance, corroded step irons and hydrogen sulphide corrosion.
The project in figures
Key figures
of the project.
From local repairs to full upgrading.
288 manholes
In the district of Gymnich.
280 km
Stadtwerke Erftstadt sewer network.
2.5 to 6 m
Manhole depth at 1 m diameter.
Case by case
A dedicated rehabilitation concept for each manhole.
Repair
From sewer brick
to mortar layer.
New channels made of sewer bricks on a base of ERGELIT-KS1, topped with a low-porosity mortar layer to protect against chemical attack.
Project data
Technology & parties.
Client: Stadtwerke Erftstadt. Design: Ingenieurbüro Köster + Volkenborn. Contractor: Katec Kanaltechnik Müller & Wahl GmbH.
Process
Precise work
in tight spaces.
Especially at transitions between the old and new structure.
Conclusion
Reliable
in the long term.
Precise manual work and high-quality materials secure the manhole infrastructure in Erftstadt for the long term. Completion was scheduled for December 2025.
Gallery
Before and
after.
Initial condition, new channel and finished coated manhole. Photos: Katec. Click an image to enlarge it.