Lateral connection rehabilitation · Art. no. HTD‑90004

Kanaltec
4.0.

Lateral connection rehabilitation in non-man-entry sewers – permanently watertight, in around 30 to 45 minutes and without pre-sealing, even with heavy water ingress.

Lateral connection rehabilitation system Kanaltec 4.0: rehabilitation packer with injection pipe on a sewer robot
Kanaltec 4.0 with rehabilitation packer on the robot before being lowered into the manhole

Lateral connection rehabilitation

Tight connections,
tight sewer network.

Once a sewer has been rehabilitated, the main sewer is watertight – but the lateral connections often remain the weak point. Connections that are not properly sealed in allow groundwater to enter.

Together with the injection and pressure-grouting mortar ERGELIT-Kanaltec, Kanaltec 4.0 connects laterals to the main sewer permanently and watertight. The mortar keys into damp substrates and reliably fills the cavities behind the connection – even in sewers with GRP CIPP liners.

Your benefits

The benefits at a glance.

Set up quickly, filled reliably, documented clearly.

No pre-sealing

Even with infiltration and heavy water ingress.

30 to 45 minutes

Short rehabilitation time, set-up takes only around 20 minutes.

From one manhole

No reduction of the cross-section in the main sewer.

With pressure sensor

Detects when the defect has been completely filled.

Sewer robot with Kanaltec 4.0 entering the manhole

From the manhole

Heavy water ingress,
permanently filled.

The robot enters through the manhole, the packer is positioned at the connection – and mortar is fed continuously until the pressure sensor reports that filling is complete.

Technical data

Technology & equipment.

Lateral connection rehabilitation system Kanaltec 4.0 – Art. no. HTD‑90004.

Main sewer: DN 200 to DN 600, optionally DN 700 to DN 800
House connections: DN 80 to DN 200
Supply line: 70 m, extendable
Time required: set-up approx. 20 min, rehabilitation approx. 30–45 min
Pressure sensor: detects when the defect has been filled
Documentation: camera monitoring by the cutting robot
Supply: power and air via the rehabilitation unit
Operation: via the existing, centrally travelling robot system and an intuitive control panel

Application

Where Kanaltec 4.0
is used.

No dewatering is required in the connection area.

Sealing off disused inlets and rehabilitating defects
Rehabilitating lateral connections with heavy water ingress and large cavities
Complete filling of cavities behind the pipe through continuous material supply
Use in concrete and vitrified clay sewers and in sewers with CIPP liners

Gallery

Kanaltec 4.0
in action.

From the manhole to the rehabilitated connection. Click an image to enlarge it.

Enquiry

Interested in Kanaltec 4.0?

We advise you on lateral connection rehabilitation, the right mortar and integration into your robot system.