Case study · 3 Feb 2026

Firefighting water tank,
mineral coating.

Rainwater had attacked the concrete of a firefighting water tank. 480 m² were rehabilitated with ERGELIT mortar using the wet-spray process.

Mineral mortar being applied by the wet-spray process
Round column with spalling and corroded reinforcement before rehabilitation

Initial situation

Rainwater, the
enemy of concrete.

Beneath a storage and maintenance hall built in 2000 lies a reinforced concrete firefighting water tank. It stores rainwater for vehicle washing and for firefighting. With a pH of down to about 4.5 and a lack of hardness, rainwater attacks concrete over the long term.

After around 20 years, spalling and corrosion had appeared and some of the reinforcement was exposed – partly because the concrete cover was too thin. The aim was to protect the reinforcement permanently and to apply a 10 mm mineral coating as new concrete cover.

The project in figures

Key figures
of the project.

Walls, floor and columns beneath a hall in use.

480 m²

Rehabilitated area including 16 round columns.

10 mm

New mineral concrete cover.

24 hours

Until back in service.

2 days early

Completed ahead of schedule.

Coated firefighting water tank after rehabilitation

Choice of process

Wet spraying, not
hand coating.

Because of the large area and restricted access, a joint site inspection led to the choice of the wet-spray process to DWA Code of Practice M 143-17 (German Water Association) – more economical and of higher quality.

Project data

Technology & material.

Structure: enviaM, Grimma (Saxony, Germany). Contractor: Kanal-Türpe Döben GmbH & Co. KG in cooperation with Hermes Technologie.

Process: dense-stream wet spraying to DWA-M 143-17
Mortar: ERGELIT-KS1 and ERGELIT-KT40 – WW mortars (water-resistant mortars) to DIN 19573, XWW3, B2
Consistency: flow spread 155 to 165 mm
Pumping: 30 m mortar hose DN 25, around 15 l/min
Air: over 1 m³/min at the nozzle, compressor with 1,500 l/min
Substrate: dry sandblasting, roughness depth over 1 to 2 mm
Machines: KS-ASS rental unit with forced-action mixer and screw pump
Team: two people in the tank, three on mixer, pump and material

Process

From blasting to
recommissioning.

Two working days with around five hours of spraying each.

Sandblast the substrate, remove rust from the reinforcement and clean with water
Pre-coat exposed reinforcement by hand with ERGELIT-KS1
Spray on 10 mm of ERGELIT-KT40 and check the layer thickness continuously
Ventilate in a controlled manner, close the access and return to service after 24 hours

Conclusion

Economical and
high quality.

The client was very satisfied with the quality. Wet spraying with ERGELIT mortars proved to be an economical, technically high-quality solution for large areas in confined conditions.

Gallery

The project
in pictures.

Rental unit, initial condition and finished coating. Click an image to enlarge it.