Process technology · Art. no. HTD-60000

ReproLining® 0.5 –
inverts newly profiled.

The invert reprofiling unit for repairing damaged sewer inverts in non-man-entry sewers from DN 100 to DN 800 – in combination with ERGELIT mortars.

Two ReproLining® 0.5 invert reprofiling devices with rubber discs, drawbar and eyelets
ReproLining® 0.5 device on a load bed next to bags of ERGELIT KS1

Invert rehabilitation

The most cost-effective solution
for a new invert.

ReproLining® 0.5 is an efficient process for the precise rehabilitation of damaged inverts in wastewater pipes – specifically in non-man-entry sections from DN 100 to DN 800, for circular and egg-shaped profiles.

It is also the ideal preparation for subsequent processes such as the centrifugal process or cured-in-place pipe (CIPP) lining. The robust unit is reusable.

Your benefits

The benefits at a glance.

Standard-compliant, robust and cost-effective – the invert is re-formed with tested WW mortar (water-resistant mortar) in a single operation.

DN 100 to DN 800

For non-man-entry sewers with circular and egg-shaped profiles.

To DWA-M 143-17

Displacement process to the code of practice of the German Water Association (DWA) – with WW mortars, tested and certified to DIN 19573.

Robust & reusable

Very robust design for continuous use on site.

In service after approx. 2 hours

Depending on the ERGELIT mortar, flow can be restored to the sewer after only about two hours.

Invert reprofiling with ReproLining® 0.5 and ERGELIT mortar in a non-man-entry sewer

Displacement process

Drawn, distributed,
cleanly profiled.

The freshly mixed ERGELIT mortar is placed in front of the unit, which is pulled through the pipe by winch in the direction of flow – filling the voids in the invert evenly as it goes.

Process

9 steps
to a new invert.

From preparation with the sewer robot to the CCTV inspection – this is how invert reprofiling with ReproLining® 0.5 works.

1 · Preparation: Milling with the sewer robot removes coarse deposits and protruding lateral connections.
2 · Cleaning: Loose particles, release agents and deposits are removed with high-pressure water.
3 · Water removal: Standing water is extracted or blown out of the pipe with compressed air.
4 · Setting up the launch manhole: Fit inflatable pipe stoppers, close off house connections and set up a wastewater bypass if necessary.
5 · Preparing the unit: Feed in the pulling cable, connect it to the reprofiling unit and mix the WW mortar in the forced-action mixer.
6 · Applying the mortar: Place ERGELIT mortar in front of the unit and pull the unit by winch in the direction of flow.
7 · Even distribution: The material fills the voids in the sewer invert evenly.
8 · Inspection: A CCTV inspection checks the rehabilitation result.
9 · Back in service: Depending on the mortar, wastewater flow can be restored to the sewer after about 2 hours.

Gallery

ReproLining® in action.

The units, a damaged invert before rehabilitation and reprofiling in the sewer. Click an image to enlarge it.

Enquiry

Interested
in ReproLining®?

We advise you on invert rehabilitation with ReproLining® 0.5 – including the right ERGELIT mortar for your sewer profile.